企业信息,成人丝袜射,日本中文字幕,初小videos第一次摘花

EPC Roads and Bridges Detection
Roads and Bridges Detection
Malkia Bridge B
Add Time:2018-11-23 View Count:952 Resoure:EPC

Mälkiä canal bridge B crosses the Saimaa canal in Lappeenranta

 

The bridge is 315 m long and it is part of the development project of the motorwat between Lappeenranta and Imatra. Main road 6 is one of the most important thoroughfares and is also one of the most popular traveling routes in Finland. The project will be completed at the end of 2010. The design has been developed to minimize construction times while ensuring that the canal traffic continues undisturbed. The prefabricated elements minimize the construction time and make the demanding time schedule possible. Canal bridge A will be built side by side to bridge B at the start of 2009.




 

Aim of monitoring:


Most interesting part to measure is the steel girders and temperature evolution between themselves. The temperature will change a lot on top of the canal which causes some strain changes to the steel structures. On concrete deck measurements will take notions of the strain changes of the concrete itself during the lifetime of the bridge. On pillar T3 SOFO sensors will measure the behaviors of the foundations. The bridge is remote monitored structure by using the SOFO Bee reading unit.
 

INSTALLATION PERIOD TYPE OF SENSORS
2008 – 2009 SOFO





Main results:

The steel girders are measured from three different locations over the canal of Saimaa. The monitored pillar T3 situates on the other side of canal. SOFO Bee unit is installed permanently to monitor bridges behaviors remotely. The data is transferred to remote office by using wireless internet access.


Recommended
主站蜘蛛池模板: 宜都市| 呼玛县| 磐安县| 唐山市| 绿春县| 建宁县| 澄江县| 永登县| 东乡| 东光县| 漠河县| 忻州市| 沁源县| 盘锦市| 上栗县| 闽清县| 辽宁省| 彭州市| 石棉县| 扶风县| 合山市| 修武县| 江永县| 遂川县| 高清| 绥江县| 东至县| 徐水县| 陕西省| 周宁县| 呼图壁县| 墨竹工卡县| 布拖县| 五常市| 平昌县| 化德县| 罗甸县| 汝州市| 定州市| 乐安县| 石渠县|