企业信息,成人丝袜射,日本中文字幕,初小videos第一次摘花

400-700-9998
歐美大地 Geophysical Engineering
Geophysical Engineering
TGV High-Speed Railway, France
發布時間:2018-11-23 瀏覽次數:891 來源:歐美大地
TGV High-Speed Railway, France


 

Background

When the LGV Méditerranée high-speed rail service was launched in France, it was a massive undertaking. Five hundred bridges and 20 viaducts were built between Valence and Marseille (approximately 250 km), during 100 million worker hours. One million trees were planted to meet environmental regulations. The CEA’s Environmental Assessment and Monitoring Department (DASE), in partnership with the French rail company SNCF, wanted to mitigate potential disaster with the TGV south-east high-speed train traveling between Valence and Marseille in the case of earthquake.



 

Challenge

Because the train travels at speeds up to nearly 300 km/h, the potential for injury is elevated should anything deform the tracks. Each train can carry between 500 and 700 passengers, making it a significant risk.



 

Solution

The aim of the system is to automatically slow down or if necessary stop the train a few seconds after detection of an earth tremor liable to deform the tracks, to avoid it reaching the damaged areas at full speed.

Configuration of the system designed by the CEA and DASE consists of 24 measurement stations, set 10 km apart, which are installed along the tracks in the seismic area between Valence, Marseille and Nîmes. In the event of ground motion above certain thresholds, a central sign posting unit in Marseille -- collecting and processing all station data -- sends an order to slow down or stop trains to the SNCF system, which centralizes all safety alarms for the line.

At the same time, a separate automatic decision support system, located in Bruyères-le-Châtel, integrates data from 14 stations of the CEA’s national seismic monitoring network, to confirm (or not) the presence of an earthquake within a 10 minute interval. This allows the SNCF to take an informed decision (resume normal operation of the line or inspect the tracks).

The devices are connected via the SNCF’s fiber optic networks and dedicated lines.

For reliability and security reasons, the emergency stop system’s main features are redunded. This system is a world first. Only Japan has set up a system of this kind, but based on a different principle and not suited to the seismic conditions found in south-east France.

System performs seismic processing, data centralizing and real-time decision support based on data from the 24 stations and alarm transmission. Automatic alarm confirmation system is utilised, integrating data from CEA network seismometers. These data provide additional information due to the sensors’ superior resolution and more extensive geographical distribution, and are therefore valuable for locating earthquakes and determining their magnitude.

為您推薦
主站蜘蛛池模板: 马公市| 海兴县| 马关县| 申扎县| 专栏| 阳信县| 晋江市| 明星| 平定县| 安龙县| 澳门| 莲花县| 昌黎县| 浮梁县| 融水| 盘山县| 汉川市| 江门市| 开江县| 高台县| 永春县| 涿鹿县| 德惠市| 西丰县| 共和县| 彭阳县| 博乐市| 玉门市| 汝城县| 石首市| 林州市| 安丘市| 双鸭山市| 全南县| 舒城县| 鸡东县| 晋城| 威远县| 桐柏县| 丹东市| 中西区|