企业信息,成人丝袜射,日本中文字幕,初小videos第一次摘花

400-700-9998
歐美大地 Pipe Leakage
Pipe Leakage
Pipeline strain monitoring in the Swiss Alps
發布時間:2018-11-23 瀏覽次數:879 來源:歐美大地
The Transitgas pipeline is 292 km long, and transports natural gas mostly from the Netherlands and from Norway to Italy


The Transitgas pipeline is 292 km long, and transports natural gas mostly from the Netherlands and from Norway to Italy.

 





The 48” pipeline crosses central Switzerland and the Alps and continues towards the south. After having crossed most of the Alps, it arrives at the Gries Massif, where it reaches Italian territory in a tunnel at an elevation of 2400 m. With its capacity of transporting, the pipeline is a key component of the European natural gas system and transports almost 15% of all the imported gas into Italy.



The pipe crosses an unstable area in Berner Oberland that would threaten the security of gas supply. In 2010 the pipeline was severely affected by mudflows, with the interruption of gas transportation. To resume and ensure the service the pipeline needed to be rerouted and monitored. Totally 36 MuST fiber optic sensors were bonded onto critical points along 500 meter of pipe crossing to assuring a continuous and automatic monitoring of the pipe along its critical sections. The pipeline cross the Aare river and the crossing is still interested from mudflow and a lot of material could be moved downstream with the pipeline. All the data coming from the various monitored sections are sent via the remote control system to be processed at the remote control center at 70 km from the site and an overview on the state and behavior of the pipeline can be viewed on different screens. The software is able to trigger alerts (SMS, mail or phone call) and show warnings on the display when strain and tension parameters in the pipe are exceeding the preset alarm thresholds. As such, the pipeline is controlled and the pipeline operator can monitor its integrity thanks to reliable information on the actual behavior of the pipe and so take supported decisions and prevent costly pipeline shutdowns.





Aim of monitoring:

Pipeline strain monitoring to assure a continuous and automatic monitoring of the pipe along its critical sections. The pipeline cross the Aare river and the crossing is interested from mudflow and a lot of material could be moved downstream with the pipeline.



INSTALLATION PERIOD TYPE OF SENSORS NUMBER OF SENSORS
2011 MuST 36



Related Papers:


Long-Range Pipeline Monitoring By Distributed Fiber Optic Sensing, D. Inaudi, B. Glisic, 6th International Pipeline Conference September 25 – 29, 2006, Calgary, Alberta, Canada – 2006
Distributed Fibre Optic Sensing for Long-Range Pipeline Monitoring, Daniele Inaudi, Branko Glisic, The 3rd International Conference on Structural Health Monitoring of Intelligent Infrastructure – SHMII-3, November 13-16 – (on conference CD) – 2007

48” steel pipe


FBG sensor with tape protection

為您推薦
主站蜘蛛池模板: 兴山县| 泰宁县| 左权县| 平潭县| 正阳县| 南康市| 浙江省| 浪卡子县| 日土县| 开鲁县| 河南省| 湄潭县| 上犹县| 新巴尔虎左旗| 拉萨市| 四川省| 石嘴山市| 宁城县| 多伦县| 枞阳县| 东乡县| 南城县| 崇义县| 新邵县| 东莞市| 安陆市| 青岛市| 如东县| 阳曲县| 江华| 彝良县| 上林县| 永修县| 同江市| 花莲市| 黄平县| 沈丘县| 富阳市| 云阳县| 郎溪县| 张家口市|