企业信息,成人丝袜射,日本中文字幕,初小videos第一次摘花

400-700-9998
歐美大地 Geophysical Engineering
Geophysical Engineering
Luzzone Dam Raising
發布時間:2018-11-23 瀏覽次數:1118 來源:歐美大地

The Luzzone dam was recently raised by 18 m to increase the capacity of the reservoir.


 

Aim of monitoring:
 

The new concrete was instrumented with long-gage SOFO sensors to monitor its shrinkage deformations and to evaluate the interaction between the newly added concrete and the old one.



 

Main results:
 

The sensors survived unharmed the installation in the coarse concrete. Then sensors monitored the deformations over years of operation and showed results compatible with the finite-element simulations.
 

INSTALLATION PERIOD TYPE OF SENSORS NUMBER OF SENSORS
1997 DiTeSt / DiTemp , SOFO 9

The Luzzone dam during construction

SOFO sensor installation in the coarse concrete

為您推薦
主站蜘蛛池模板: 新干县| 体育| 哈巴河县| 澄迈县| 宜兴市| 宁陵县| 罗江县| 兴隆县| 沁水县| 孟连| 台湾省| 三江| 金山区| 延吉市| 长丰县| 安图县| 喀喇| 南郑县| 乐山市| 罗山县| 馆陶县| 和田市| 赫章县| 湘乡市| 青浦区| 昆明市| 保康县| 闵行区| 和田市| 射阳县| 黄大仙区| 古蔺县| 如皋市| 前郭尔| 郎溪县| 秀山| 衡山县| 嘉兴市| 安多县| 大丰市| 汝南县|