企业信息,成人丝袜射,日本中文字幕,初小videos第一次摘花

EPC Products Nondestructive testing Concrete structure inspection CorroRisk - Retro-Fit Corrosion Front Probes
產品中心
BBS|Hot Topic
CorroRisk - Retro-Fit Corrosion Front Probes

Model:CorroRisk

Use:The CorroRisk probe has been developed for corrosion monitoring on existing concrete structures.

Standard:

Product Detail

CorroRisk - Retro-Fit Corrosion Front Probes

The CorroRisk probe has been developed for corrosion monitoring on existing concrete structures. The chloride probe ensures that reinforcement corrosion can be predicted in good time before the actual initiation. The planning of the necessary maintenance can be optimised and the result is a lower cost of repair and fewer traffic obstructions.

The CorroRisk probe is recommended to be used in all types of existing concrete structures, especially in aggressive corrosive environments and where visual inspection is difficult. This could e.g. be pillars in seawater (Figure 1), bridge decks, multi-storey car parks exposed to de-icing salt and various structures in swimming pools.

CorroWatch is recommended for new structures. It is installed before casting the concrete.

Image: CorroRisk probes mounted on bridge pillar.

 

STRUCTURE

The CorroRisk probe consists in the standard version of 4-8 measuring electrodes and 1 combi-electrode. The electrodes are made of the same material as the reinforcement. The combi-electrode consists of a titanium net and a reference electrode (ERE20), which has been developed earlier for use in concrete structures.

Image: CorroRisk mounted on bridge pillar and covered with latticework.

MEASURING METHOD

Initial corrosion is discovered when threshold values of the potentials or current have been exceeded. The potential of the equilibrium is measured between the combi-electrode and the individual electrodes in the concrete cover.

INSTALLATION

The CorroRisk is usually mounted in the cover layer between the concrete surface and the outer reinforcement layer. The electrodes are mounted in different but well-defined depths in the cover layer. All electrodes are mounted in a circle around the combi-electrode. The electrodes are supplied with a coaxial cable, which on the concrete surface is protected by a latticework. The cables are lead to a monitoring box, and e.g. a data logger (Figure 2 and 3).

Image: Sectional view of the mounted CorroRisk probe.

CorroZoa

The CorroZoa is a data logging Zero Ohm Ammeter designed for compatibility with Force’s CorroWatch and CorroRisk chloride monitoring probe systems.

The CorroZoa will measure half-cell potential, corrosion current, and temperature. The unit can either be used manually or automated and left as a data logger.

 



主站蜘蛛池模板: 万荣县| 天全县| 龙胜| 台州市| 三原县| 牡丹江市| 永平县| 齐齐哈尔市| 慈利县| 奎屯市| 富川| 延庆县| 崇左市| 策勒县| 巴马| 当雄县| 西藏| 迭部县| 大同市| 富平县| 临江市| 青神县| 临沂市| 金寨县| 盐池县| 海兴县| 同江市| 汪清县| 宾阳县| 武山县| 颍上县| 安陆市| 梅河口市| 象州县| 来宾市| 台中市| 东乡县| 专栏| 焉耆| 重庆市| 江永县|